Saggio Hills Development (Montage) Park Preliminary Master Plan

The Saggio Hills Development (Montage) park area is located on the north side of Healdsburg, adjacent to the Montage Resort and Healdsburg Avenue. The City is receiving approximately 38 acres of land as part of the resort project for the new public park, and the developable area shown is about 12 acres.  The site is comprised of rolling oak grasslands with scattered oak trees, seasonal wetlands, a flood detention basin for Foss Creek and a storm water basin for a nearby future housing site.  

The preliminary master plan includes restoration of the Foss Creek riparian habitat, an improved trail network, various parking lots at different park entry points, frontage planting to match the surrounding vineyards and seating at site overlook points. New amenities include sports fields and courts, play areas, a large picnic pavilion, bandshell, open lawn areas, dog play area, community garden, a pump track, picnic grove and special use gardens (e.g. native plantings, pollinator gardens, and habitat for insects and reptiles).

Preliminary Master Plan

Below are images for the preliminary master plan that City Council reviewed on September 20, 2021. You can download a complete set of the preliminary master plan drawings as a single PDF file for viewing here

Next Steps

The project moved into the environmental review process in Spring 2023. Once the environmental review process is complete in the Summer of 2023, City Council will review the environmental/final park design and make funding decisions that will guide the final design process and potential phasing for the park's development. Construction is anticipated to begin in 2024 with completion in 2025. Please check back for updates. 

Saggio Hills Park Aerial
19-012_Healdsburg Park Virtual Open House_Page_05
19-012_Healdsburg Park Virtual Open House_Page_06
19-012_Healdsburg Park Virtual Open House_Page_07
19-012_Healdsburg Park Virtual Open House_Page_08
Pages from Montage Development Park Preliminary Master Plan_Page_2
Pages from Montage Development Park Preliminary Master Plan_Page_3
Pages from Montage Development Park Preliminary Master Plan_Page_4
Pages from Montage Development Park Preliminary Master Plan_Page_5
Pages from Montage Development Park Preliminary Master Plan_Page_6
19-012_Healdsburg Park Virtual Open House_Page_13

Precedent Images

Pages from Montage Development Park Preliminary Master Plan 9.20.21