Applications and Studies in Progress

The following applications have been received for consideration by the Planning Department.

To inquire about current applications please call 707-431-3348 or email .

Applications

Application activity table.
Location                               Application     Description Documents      Hearing Date                          
155 Dry Creek Road DR2022-01 Dry Creek Commons - Affordable housing Mitigated Negative Declaration  PC Workshop 2/23/2022
15119 Grove St TM 2018-02 Tentative Subdivision Map to divide a 2.16-acre parcel into 4 lots and a designated remainder parcel   TBD
3 Healdsburg Avenue DR2017-17
HT2021-02
Development of a 30-unit apartment project The applicant requested a continuance to allow time for a neighborhood meeting, plan revisions, and PC workshop before returning to the PC for a public hearing. TBD
16977 Healdsburg Ave
DA 2020-01.04 
CUP 2019-04.02 
DR 2021-07.01 
CUP 2021-04.01 
TM 2022-07
North Village Project Entitlements: (1) Amendments to Development Agreement to modify affordability levels for residential uses; (2) Amendments to Master Conditional Use Permit to modify sitewide shared parking plan; (3) Amendments to Major Design Review and Conditional Use Permits for Mixed Use Project on Parcel 4 to address changes to facades, massing and site amenities; (4) Tentative map for Parcel 4 to establish common parcel and three airspace parcels. North Entry Area Plan - Materials PC 2/28/23
16977 Healdsburg Ave - Comstock Mixed Use and Hotel DR 2021-06
DR 2021-07
CUP 2021-03
CUP2021-04
Mixed-use retail and residential development with 45 apartments, 5 live-work units and approximately 12,500 sq. ft. of retail space and a 108-key hotel    PC 5/25/2021 - Approved
16977 Healdsburg Ave -Enso Village CUP 2020-02
​DR 2020-09
Enso Village Senior Living Community Application Materials PC 11/17/2020
​Approved
16977 Healdsburg Ave CUP 2019-04 The North Village Master Conditional Use Permit and Density Bonus Applications Application Materials PC 2/11/2020
​Approved
146-168 Healdsburg Ave TM2017-01
​CUP2017-12
​DA 2018-01
​The Mill District
Tentative map, master conditional use permit, and development agreement to divide the property into seven lots, provide 208 units of multi-family housing, a 53 room hotel, and 15,000 sqft. of commercial uses in multiple buildings. Application Materials
Approval Hearings
PC 1/8/2019
146-168 Healdsburg Ave Lot 7 - The Mill District On June 6, 2019, the City received a Major Design application for a four–story affordable housing development containing 41 units, 41 parking spaces, and associated on-site improvements and landscaping.  PC 6/25/19
Approved
PC 2/11/2020 (Revision)
146-168 Healdsburg Avenue Lot 1 - Mill District Amenities Building
DR 2022-06,  CUP 2022-03 
Construction and operation of a two-story building featuring a ground level fitness center and a second story lounge and pool to be used as an amenity and clubhouse for homeowners in the Mill District.   PC 6/8/2022
146-168 Healdsburg Ave Lot 4 - Residential Development On December 4, 2019, the City received a Major Design Review application (DR 2019-25) for a four-story residential building over underground parking. The project would include 40 residential units located in three buildings over a 72 parking space underground garage. The project also includes associated site improvements and landscaping.  Project Plans PC 3/10/2020
​Approved
146-168 Healdsburg Ave Lot 5 - Park On December 4, 2019, the City received a Major Design Review application (DR 2019-24) for a new .78 acre park located at the center of the site in and around the existing Redwood trees on Healdsburg Avenue. The park would include a grassy open area, pathways, play area and other amenities. 
PC 3/10/2020

​Approved
400, 412, & 418 Healdsburg Ave DR 2019-02 Development of a 16-guestroom hotel with lobby, retail, open space, and parking provided at the ground floor. Workshop Materials PC Workshop 1-25-2022 Recording
807 Healdsburg Ave DR 2019-11 Major Design Review for the demolition of two existing dwelling units and construction of a two-story mixed-use building containing a first-floor commercial space with one (1) residential unit above and an additional two-story residential building with three (3) multi-family units on a .5 acre site.   PC 9/22/2020
​Approved
3 North Street GPA 2022-01
LUA 2022-01
CUP 2022-02
DR 2022-03
HT 2022-01
Cerri Building / Foley  Family Pavilion
Reconstruction of an existing metal building for a new use as a community pavilion with associated parking and utility improvements.
   
120 Parkland Farms Blvd  TM 2015-07 Parkland Farms Subdivision Phase 11 - 11 lots See 6-22-2020 City Council agenda packet for final application documents PC 10/8/2019
PC Approval

​CC 6-15-2020 (Continued)

CC 6-22-2020​ Approval
450 Parkland Farms Blvd DR 2022-05 Affordable housing, 110 units with associated open space, parking, and community facilities.   PC Workshop 3/8/2022

Studies

Subject                            Description Links                     Schedule        
Adopted plans and studies  can be found here      
       

June 2023

Sun Mon Tue Wed Thu Fri Sat
28 29 30 31 01 02 03
04 05 06 07 08 09 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 01
View All

What are they doing?



Click here to see a Construction Activity map showing public and private projects under construction.